Project Implementation Manual

Project Implementation Manual revision 3.1
(published in August 2021)

BSB371 Treasure
  • Project Implementation Manual revision 3 (applicable starting with December 2020) can be downloaded from here
  • Project Implementation Manual revision 2 (applicable during October 2019 – November 2020), including updated and new annexes can be downloaded from here
  • Project Implementation Manual revision 1 (applicable during October 2018 – September 2019) can be downloaded from here
  • Project Implementation Manual for ENI CBC Black Sea Basin Joint Operational Programme 2014-2020, 1st Call for proposals (applicable during July-September 2018)